RackSwitch G8296
End of Service Life
December 31, 2024
*Inclusion in the EOSL library does not guarantee Park Place can support that specific device.
The Lenovo RackSwitch G8296 end of life date matures in December of 2024. When your operating system version becomes outdated, you need to ensure your IT systems will reliably operate. You can opt for post-warranty hardware maintenance from a trusted third-party Lenovo provider like Park Place Technologies. Our storage infrastructure maintenance agreements are generally 30-40% less than your old OEM contracts.
Contact us for a maintenance quote when your Lenovo RackSwitch G8296 EOL and EOSL dates approach or have passed!
Related Lenovo EOSL Dates
| Model | EOSL Date | |
|---|---|---|
| RackSwitch G7028 (7159-BAX) | 06 / 30 / 2024 | |
| RackSwitch G8052 (7159-HC1) | 12 / 31 / 2025 | |
| RackSwitch G8272 (7159-CRW) | 12 / 31 / 2025 | |
| RackSwitch G7052 (7309-CAX) | 12 / 31 / 2023 | |
| Flex System FC5022 24-port 16Gb SAN Scalable Switch | 10 / 31 / 2025 | |
| Flex System Chassis | 10 / 31 / 2025 | |
| Flex System FC5022 18Gb SAN Scalable Switch | 10 / 31 / 2025 | |
| Flex System FC5022 24-port 16Gb ESB SAN Scalable Switch | 10 / 31 / 2025 | |
| Thinkagile Sxm X3650M5 | 12 / 31 / 2025 | |
| ThinkSystem NE0152T 1G RackSwitch | 12 / 31 / 2025 | |