zEnterprise EC12 (zEC12)
End of Service Life
December 31, 2023
*Inclusion in the EOSL library does not guarantee Park Place can support that specific device.
When the zEnterprise EC12 EOSL date arrives, you need to have a refresh or IBM zSeries Mainframe support plan lined up for business continuity. IBM hardware support from a trusted third-party provider like Park Place Technologies can extend the life of your data center hardware while saving you 30-40% on server maintenance. Get a quote on our server maintenance today!
Upcoming IBM EOSL Dates
| Model | EOSL Date | |
|---|---|---|
| Flashsystem 5030 24-Slot 2.5in Control Enclosu | 12 / 31 / 2026 | |
| Flashsystem 5010 24-Slot 2.5in Control Enclosu | 12 / 31 / 2026 | |
| 7063-Cr1 Power System Hmc | 12 / 31 / 2026 | |
| 2147-Sa2 San Volume Controller | 12 / 31 / 2026 | |
| 2145-Sv1 San Volume Controller | 12 / 31 / 2026 | |
| Flashsystem 5100 NVMe Control Enclosure | 12 / 31 / 2026 | |
| Flashsystem 5030 12-Slot LFF Control Enclosure | 12 / 31 / 2026 | |
| Ts4300 40-Slot Tape Library | 12 / 31 / 2030 | |